Industrial Projects

Persistant Systems
Architect : Paranjape Schemes
Year : 2004 - 2006
Area: 7,50,000 Sq Ft.
Salient Features:
  • This building is also a modern design with glass and aluminum façade to       the elevation of the buildings.
  • Designed for software industry it has a large basement and construction        area measures 750000 sft. The cost of construction was15,00,00,000/-.          Steel and Cement being supplied by the clients to us.
  • The building is designed without beams and has post tensioned slab in      M35 concrete.
  • The structure is 11th stories and the central Atrium slab is at the 8th floor       level.
  • This project was started in December 2004 and handed over as specified       in 22 months. The quantity of concrete pumped was 17000 cum approx.       and steel used 2500 MT. The work consisted of flat post tensioned slabs       in M 35 concrete. The total cost of project was Rs.24,32,50,000 /- All       equipment such as concrete pump, crane etc. is in house. We had       specially purchased 40000 sft. of steel shuttering for flat slabs for this       project.